
As a subconsultant, SI Engineering, P.C. (SIE) provided construction inspection services for the installation of a temporary bulkhead in a connecting water tunnel, between the two basins that form the Jerome Park Reservoir. Work included demolition of old 72″ sluice gates, actuators, steel frames, and concrete / brick foundations at Gate House #1. The project also involved inspections and quality control work for installation of a 48″ diameter water pipeline with steel reinforcement and concrete encasement, as well as restoration of excavation, including placement of clean fill, DGA base, and concrete sidewalk restoration at Jerome Park Reservoir.