As a subconsultant, SI Engineering, P.C. (SIE) provided biennial inspection and reporting for the JFK terminal bridges. Including the review of load ratings based on inspection findings, this project involved a 100% hand’s-on inspection of various structures, including multi-girder, girder / floorbeam / stringer, concrete beams including fracture critical items such as steel floorbeams and cap beams. The inspection followed the latest NYSDOT BIM which required documentation and photographs of conditions which are rated condition rating of CS-3 through CS-5 including any increase ratings from the previous inspection. The field note documentation included sketches, updating previous inspection findings including updating the PANYNJ condition reports which included priority / safety / routine repair recommendations. The report included both the NYSDOT and PANYNJ condition reports which including narrative, priority / safety / routine repair recommendation tables, and general findings with updated drawings.